
All Articles
Case Study 2026-04-057 min read
River-crossing installations with self-floating hose
The FRH built-in-foam approach vs external floaters — where each one wins.
Why FRH for crossings
A flexible floating dredging hose carries its own closed-cell foam layer, so there is nothing to bolt on, nothing to lose overboard, and the line follows the current instead of fighting it.
Under working conditions with sand content ≤30%, at least 30% of the outer diameter stays above the water line.
When external floaters win
For long straight offshore mains, HDPE pipe plus FLT floaters is cheaper per metre and easier to repair section by section.
Field result
On a 280 m river crossing in Southeast Asia, an 11.8 m FRH train replaced 40 external floaters and cut install time from three days to one.
Need this specced for your site?
Send diameter, working pressure and deployment environment — we reply with a matched solution within 24 hours.
Get A Matched Solution

